Getting Ready to Cast | Product Reviews Coming Soon
Last August marked the beginning of Monitor. We sat down with only 12 pages of script and discussed the script, location possibilities and distribution options. Though we were unsure where this project was going – the consensus was that two years was a long way away.
And now we’ve reached our halfway mark. In a few weeks we’ll be ready to cast, and in another 12 months this project will be in the can and ready for post production. We have a location secure, and story boarding and scheduling is well under way. Our crew is locked, and in another few weeks we’ll be going back out to the location to do some serious prep work. It’s incredible how far along this project has come, and it probably wouldn’t be possible without you guys – so thank you.
In a meantime we’ll be releasing a product review for Film Tips and Tutorials covering Kessler Crane’s KC – Lite and Cobra Crane’s track and dolly system. We’re scheduled to release probably Saturday.





Leave a Reply